Skip to main content

It could have been even worse!

Which of these proposed lots in West Campus were never built?

(From "McMaster University Internal Traffic and Parking Report, Ultimate Campus Development" February 1969)


(answers: W4 - 90 spaces  and Lot W6, 200 spaces on the west side of Ancaster Creek, both to be built in 1972. Also, the G4 section was to be a parking structure to hold 1,000 vehicles with a completion date of 1975)

Comments

Popular posts from this blog

Turtle Trouble on World Turtle Day

A new virus infecting the local turtle population, road mortality as cars and trucks continue their shell-crushing trips down Cootes Drive.

Yes, it's WORLD TURTLE DAYand things are admittedly pretty bad for our slow-moving reptile friends.

That means it's time to make some changes!
Why not start with things we can easily control, like our own behaviour. Driving along Cootes?

Pledge now to use an alternate route
(click on the link above to take the pledge!)
A minute or two will save lives!





Coldspring Valley History Hike: Water Innovation Week

We're heading back out to share the history of this former floodplain/nature sanctuary, and take a look at the rehabilitated future of this contested site in McMaster's west campus. Can we really depave Paradise? It's happening!

Register on Eventbrite: http://bit.ly/waterweekwalk2017 (by donation)




History Hike in West Campus Tuesday, September 11 at 2pm

We're going on a hike to introduce McMaster students (and any other interested participants) to this former RBG Coldspring Valley Nature Sanctuary and coldwater creek floodplain  - currently a parking lot - to examine the past, present and future of this place that is undergoing an important ecological transformation.
Tour Leaders Dan Coleman (English Professor and author of Yardwork: A Biography of an Urban Place)Randy Kay (Restore Cootes)Judy Major-Girardin (School of the Arts)